back home A2 Świecko - Konin | Every kilometer matters
Back

Pavement Renovation at the Torzym Interchange

On 22 July, roadworks will begin on a section of the motorway interchange in Torzym (at the 35th km of the A2 motorway). As a result, drivers should expect changes in traffic organization.

In the first stage, the exit ramp from the A2 towards Torzym (coming from Warsaw) will be temporarily closed for approximately two days. During this time, drivers traveling from Warsaw to Torzym and Sulęcin will be directed to take a detour via the Jordanowo interchange and national road 92. Please pay close attention to the road signs.

mapa objazd wezel torzym 2 300x300

In the second stage, road crews will begin renovating the roundabout that connects the motorway exit with provincial road no. 138. These works will also take approximately two days. During the day, manual traffic control will be in place at the roundabout. In the evening and at night, it will be possible to drive through the roundabout; however, please note that road markings will be absent – we kindly ask drivers to exercise extra caution and follow all temporary traffic signage.

The company has instructed the contractor to complete the work on schedule; however, adverse weather conditions may affect the timeline. We apologize for any inconvenience and thank you for your understanding.

Current traffic updates for the Wielkopolska Motorway (the A2 concession section from Świecko to Konin) are available on the website: https://a2.codocaine.com/aktualna-sytuacja/ and on X (formerly Twitter): https://x.com/AutostradaWlkp